Services

Bulk haulage by road for mines, smelters and contractors in Zimbabwe.

  • Chrome ore and mineral haulage

    Ore, concentrate and other bulk minerals moved from the mine to the smelter, rail siding or stockpile.

    • Mine-to-smelter and mine-to-siding runs
    • Every load weighed, with a weighbridge ticket for each trip
    • Single trips or ongoing tonnage
  • Contract haulage

    Trucks assigned to your operation on a monthly or tonnage-based contract, so your output moves on a predictable schedule.

    • Rates agreed per tonne or per trip
    • A monthly statement of every load moved
    • One named contact for the contract
  • General bulk freight

    Sand, aggregate, construction materials and other bulk loads across Zimbabwe.

What we need to quote

The more of this you can send, the faster and more accurate the quote.

  • The material, and its grade if relevant
  • Estimated tonnage, per trip or per month
  • Pickup and delivery locations
  • Loading and offloading arrangements at each end
  • When the work starts and how long it runs

Request a quote